Procedure
Procedure
- Permit Difficulty High
A procedure that allows a business, activity or stay that the law generally restricts, after review; licenses fall into this type. The authority reviews facility standards, location and consultation with other agencies, and a permit can be refused if the standards are not met.
- Notification Difficulty Low
You submit the statutory report form and required documents. Once the documents are in order the report is accepted; for some reports the authority checks the contents before accepting it.
- 01
Check the register use and the target use: Check the current use of the floor or unit and any illegal-building mark in the building register, then decide which item of Table 1 of the Enforcement Decree the new use falls under. A Category 2 neighborhood living facility manufacturing shop must stay within the floor area and emission facility standards of Table 1; beyond them it is treated as a factory.
- 02
Decide permit, report or register change: Compare the facility group numbers in Article 14(5) of the Enforcement Decree: a higher group needs a permit, a lower group needs a report, and the same group needs a building register change application. Changing from the neighborhood living facility group to a factory in the industrial group is a change to a higher group and requires a permit.
- 03
Prepare the application and attachments: Use Form No. 1-4 of the Enforcement Rule of the Building Act for a permit, Form No. 6 for a report, and the building mark change application for a change within the same group. A permit or report attaches the post-change floor plan and drawings showing changes to fireproofing, fire prevention, evacuation or building equipment; the permit authority checks the pre-change plan against the building register.
- 04
Submit to the si/gun/gu and handle supplements: Submit to the building department of the si/gun/gu where the building is located, or electronically through Seumteo. The permit authority checks compliance with relevant laws and issues the permit or report certificate; the legal processing period for a building mark change application is 7 days, and any supplement request is answered within the deadline.
- 05
Use approval and business registration: If the floor area of the changed part totals 100㎡ or more, apply for use approval; once approved, the si/gun/gu corrects the register entry ex officio according to the use approval certificate. After confirming the corrected register use, proceed with food manufacturing registration or factory-related applications.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
건축ㆍ대수선ㆍ용도변경(변경)허가 신청서(별지 제1호의4서식)
건축ㆍ대수선ㆍ용도변경(변경)신고서(별지 제6호서식)
건축물표시(변경, 정정) 신청서(별지 제15호서식)
(임시)사용승인 신청서(별지 제17호서식)
If the register use is not checked before signing a lease or starting interior work, the registration stage may demand supplements for a use mismatch and delay the business start date.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.
