Procedure
Procedure
- Notification Difficulty Low
You submit the statutory report form and required documents. Once the documents are in order the report is accepted; for some reports the authority checks the contents before accepting it.
- 01
Confirm coverage and waste type: Check whether the site is covered by Article 18(1) of the Enforcement Rule using whether it has emission facilities and its average daily volume (100 kg for emission facilities, 300 kg for other sites, 5 tons in total for construction works), and separate excluded items such as waste paper and scrap metal from designated waste.
- 02
Check designated-waste status in advance: Waste that may be classified as designated waste because of hazardous substance content must be checked in advance through a waste analysis institution, and the waste analysis result is attached to the report.
- 03
Prepare the consignee capacity confirmation and report form: Obtain the consignee treatment capacity confirmation (Form No. 5) from the contracted treatment company, then complete Form No. 6 for ordinary sites, Form No. 7 for construction works, or Form No. 8 for a joint treatment body.
- 04
File with the local government: Ordinary sites file within 1 month of starting business or of the waste being generated, construction works by the scheduled discharge date (start of construction), and the representative of a joint treatment body within 7 days of starting business. The local head notifies acceptance within 20 days and issues the report certificate.
- 05
Enter hand-over data in the Allbaro system: Each time waste is handed over, the discharger, the collector-transporter and the treatment company each enter the hand-over and receipt details and on-site data such as weighing values, and the discharger checks the entries.
- 06
Change reports and performance report: If the monthly average volume rises by 50 percent or more, the business name or location changes, or the treatment plan by waste type changes, file a change report within 1 month of the event. Submit the waste discharge and treatment performance report through Allbaro by the end of February of the following year (within 15 days after discharge ends for construction works).
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
사업장폐기물배출자(신고서, 변경신고서)(「폐기물관리법 시행규칙」 제18조제2항제1호 및 제4항에 해당하는 경우)(별지 제6호서식)
수탁처리능력 확인서, 폐기물 수탁확인서(별지 제5호서식)
If the treatment company or treatment method is changed without a change report within 1 month, the report no longer matches the Allbaro entries and the site is easily cited in inspections.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.