Procedure
Procedure
- Notification Difficulty Low
You submit the statutory report form and required documents. Once the documents are in order the report is accepted; for some reports the authority checks the contents before accepting it.
- 01
Check the connection to the indoor business area: The outdoor business area must be directly connected to the business area inside the building. On a different floor it must be directly accessible up or down, and a separate space reached by going around the outside of the building is unlikely to be accepted.
- 02
Check the right to use: For a detached building, prove the right to use through ownership or a lease. In a multi-unit building an exclusive use right under the management rules is required and common areas cannot be used, so also check that the lease states the terrace use scope.
- 03
Review conflicts with laws in advance: The report cannot be made if the space is a public open space, an open space within the site, mandatory landscaping, an evacuation route, a road or a mandatory parking space. Compare the building register and layout with the site to filter out prohibited items first, and also check the local government's outdoor business criteria.
- 04
Meet the facility standards: On the second floor or above, a railing of at least 1.2m is required. Fixed structures are not allowed, only movable furniture, and open flames cannot be installed, so match your installation plan to these standards.
- 05
Check disaster liability insurance: Rest-area and general restaurants are required to carry disaster liability insurance if the combined indoor and outdoor floor area is 100㎡ or more. Calculate the total area and decide on coverage before reporting.
- 06
File the change report with the hygiene department: Prepare the change report with the existing business report certificate, a plan of the outdoor area and use right documents and file within 7 days of the change. If supplementation is requested, respond with drawings and site photos.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
식품 영업신고사항 변경신고서(별지 제41호서식)
If a structure such as a fixed deck or roof is built first, the report may be refused for conflicting with an open space or evacuation route and the structure may have to be removed, so check conflicts before construction.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.