11-6 · Food manufacturing & distribution businesses

Preparation and submission of application documents for domestic HACCP certification

HACCP is a standard for analyzing hazards from raw materials through manufacturing, processing and distribution, setting critical control points and managing them, based on Article 48 of the Food Sanitation Act for food and Article 9 of the Livestock Products Sanitary Control Act for livestock products. Business operators who make mandatory foods such as fish paste and fish sausage, frozen fish, mollusks and seasoned processed products, and frozen pizza, dumplings and noodles must comply with the certification standards, and other operators may obtain certification voluntarily. Applications are submitted for each workplace to the Korea Agency of HACCP Accreditation and Services with the food safety management certification plan attached, and a certificate is issued after document review and an on-site inspection. Certification is valid for 3 years, and an extension application must be filed at least 60 days before expiry to keep it.

HWANG YUNSANG ADMINISTRATIVE OFFICESONGDO · 37.3892° N / 126.6439° E
#Preparation and submission of application documents for domestic HACCP certification#Official check#11-6
🌐 Preparation and submission of application documents for domestic HACCP certification
01

Procedure

Procedure

Procedure type
  • Certification Difficulty High

    Designation or certification after document review and on-site evaluation against the criteria set by the agency. The result depends on the evaluation score or review outcome.

We will prepare application documents for HACCP certification for domestic food and livestock workplaces. We distinguish between reviewing and supplementing existing standards and creating new documents, and documents are prepared based on data confirmed by the technical manager. Review of export-country registration requirements and preparation of export submissions are separate services.

Scope & fee
Review/supplement existing HACCP documents/apply for certification/non-visit
We will review 40 pages of HACCP standards, plans, and records in actual operation for 1 food manufacturing workplace, 1 product group, and 1 process, and prepare 4 pages of limited information and certification application documents. We will proceed based on review of non-visit materials and preparation of application documents. It does not include the creation of a new document system, facility construction, scientific verification, testing, training, or registration in the export country.
Official fee source ↗
Existing HACCP document review/supplementation/certification application/2 on-site
We will review 40 pages of HACCP standards, plans, and records in actual operation for 1 food manufacturing workplace, 1 product group, and 1 process, and prepare 4 pages of limited information and certification application documents. We include two visits to compare field data in the the Seoul metropolitan area area. It does not include the creation of a new document system, facility construction, scientific verification, testing, training, or registration in the export country.
Official fee source ↗
Create new HACCP standard/management plan/apply for certification/2 on-site
We will fill out 20 pages of prerequisite standards, 15 pages of HACCP management plan, and 6 types of record forms for 1 food manufacturing workplace, 1 product group, 1 process, and 2 CCPs and then apply for certification. Two site visits to the the Seoul metropolitan area area are included. This is the standard for receiving risk analysis, verification, testing, and technical data, and does not include construction, preparation of actual operation records, scientific verification, testing, training, or registration in the export country.
Official fee source ↗
Livestock product processing: Review/supplement/certify application/non-visit of existing HACCP documents
We will review 40 pages of HACCP standards, plans, and records in actual operation for 1 livestock product processing workshop, 1 product group, and 1 process, and prepare 4 pages of limited supplementary text and certification application documents. We will proceed based on review of non-visit materials and preparation of application documents. It does not include the creation of a new document system, facility construction, scientific verification, testing, training, or registration in the export country.
Official fee source ↗
Livestock product processing: Review/supplement/certify application for existing HACCP documents/2 on-site visits
We will review 40 pages of HACCP standards, plans, and records in actual operation for 1 livestock product processing workshop, 1 product group, and 1 process, and prepare 4 pages of limited supplementary text and certification application documents. We include two visits to compare field data in the the Seoul metropolitan area area. It does not include the creation of a new document system, facility construction, scientific verification, testing, training, or registration in the export country.
Official fee source ↗
Livestock product processing HACCP standard/management plan new creation/certification application/2 on-site
We will fill out 20 pages of prerequisite standards, 15 pages of HACCP management plan, and 6 types of record forms for 1 livestock product processing workshop, 1 product group, 1 process, and 2 CCPs and then apply for certification. Two site visits to the the Seoul metropolitan area area are included. This is the standard for receiving risk analysis, verification, testing, and technical data, and does not include construction, preparation of actual operation records, scientific verification, testing, training, or registration in the export country.
Official fee source ↗
  1. 01

    Confirm coverage and scope: Check whether the products are mandatory foods under Article 62 of the Enforcement Rules of the Food Sanitation Act or a livestock products business, and decide the workplace and product groups to be certified. If preparing to export, also check the hygiene registration requirements of the importing country to set the scope of the documents.

  2. 02

    Prepare the prerequisite program standards: Document the facility and hygiene management standards that must be in place before applying HACCP, such as the workplace, hygiene, manufacturing facilities, refrigeration and freezing equipment, water, storage and transport, testing and recall management, to suit the workplace, and set the inspection log formats.

  3. 03

    Prepare the HACCP plan: Analyze biological, chemical and physical hazards for each product and process, and based on the process flow chart set the critical control points (CCPs), critical limits, monitoring, corrective actions and verification procedures, compiling them into the food safety management certification plan.

  4. 04

    Training and operating records: The operator and employees complete HACCP training at a training institution and build up operating records such as hygiene inspection logs and temperature records for a period according to the prepared standards. The on-site inspection uses these records to confirm actual operation.

  5. 05

    Apply for certification and supplement documents: For food, submit the HACCP-applied business certification application with the certification plan for each workplace to the Korea Agency of HACCP Accreditation and Services. If the documents are insufficient, a supplement request is issued, so submit the supplementary documents within the deadline.

  6. 06

    On-site inspection and post-certification management: Correct the items pointed out in the on-site inspection and receive the certificate. To change critical control points or the business location, submit a change application, and following the notice the agency sends at least 90 days before expiry, submit the extension application at least 60 days before expiry.

02

Filing route

Filing route

Korea Agency of HACCP Accreditation and Services (application for each workplace or business)

Confirm the current filing office, jurisdiction, and online availability on the official website.

Official check
Actual processing agencyCompetent Korean authority or official service
Statutory and policy authorityMinistry of Food and Drug Safety
Online routeOfficial check
03

Deadlines & processing notes

Deadlines & processing notes

Check deadlines and next steps against the notice, filing date, and any request for additional documents.Official check
04

Fees & official charges

Fees & official charges

Administrative service fee
  • Review/supplement existing HACCP documents/apply for certification/non-visit from KRW 600,000
  • Existing HACCP document review/supplementation/certification application/2 on-site from KRW 900,000
  • Create new HACCP standard/management plan/apply for certification/2 on-site from KRW 2,300,000
  • Livestock product processing: Review/supplement/certify application/non-visit of existing HACCP documents from KRW 600,000
  • Livestock product processing: Review/supplement/certify application for existing HACCP documents/2 on-site visits from KRW 900,000
  • Livestock product processing HACCP standard/management plan new creation/certification application/2 on-site from KRW 2,300,000
All administrative service fees exclude 10% VAT.

Included in the basic fee — Initial document review, required-document guidance, basic form preparation, one filing support and responses to up to two supplement requests.

Conditional success fee — For this service, any conditional success fee may be separately agreed within the lawful service scope and stated in a written engagement agreement. No outcome is guaranteed.

Displayed amounts are starting estimates, not statutory or standard rates. The final fee is confirmed after consultation and document review in the engagement agreement. Government fees and actual expenses may change.

Fees & official charges →
05

Basic documents

Basic documents

Basic documents0 / 8

An extension application must be submitted at least 60 days before the 3-year validity period ends, so the extension schedule and the updated certification plan to be submitted at that time should be prepared in advance based on the certification date.

Scope of services

Scope of services

Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.