Procedure
Procedure
- Permit Difficulty High
A procedure that allows a business, activity or stay that the law generally restricts, after review; licenses fall into this type. The authority reviews facility standards, location and consultation with other agencies, and a permit can be refused if the standards are not met.
- 01
Check permit requirements and deemed permits: Confirm the zoning through the land use plan certificate, the permitted scale by zone, and whether urban planning committee review is required. At this stage, also decide whether other permits, such as a private road opening permit, road occupation permit or road connection permit, will be processed together with the development activity permit.
- 02
Prepare and file the application: Attach proof of the right to use the land, a site layout, and design documents and cost breakdowns for hazard prevention, pollution prevention, landscape and planting to the Development Activity Permit Application (Form No. 5 of the Enforcement Rule) and file it with the district office; electronic filing through the national land use information system is also available.
- 03
Deemed permit documents and permit conditions: To obtain permits under other laws at the same time, the documents required by those laws must be submitted with the development activity permit application (Article 61 of the Act). If the permitting authority intends to attach conditions on infrastructure or hazard prevention, it must first hear the applicant's opinion, and a written opinion is submitted at that point.
- 04
Completion inspection: After completing land form changes, structure installation or earth and stone extraction, file without delay a Development Activity Completion Inspection Application (Form No. 6) with completion photos and, where required, a cadastral survey result map. For buildings, the use approval under the Building Act replaces this inspection.
- 05
Land subdivision and land category change: When the use of part of a parcel has changed or a reason for changing the land category arises, apply to the cadastral authority within 60 days from that date. Attach a copy of the subdivision permit for land requiring one, and a copy of the document proving completion of works for a land category change.
- 06
Submit the development cost statement: If the project is subject to development charges, submit the statement with evidence of construction, design and survey costs within 40 days from the end of the assessment period. The district office gives advance notice of the expected charge within 60 days of submission, and an objection may be filed as a pre-assessment review request within 30 days of receiving that notice.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
개발행위(변경) 허가신청서(별지 제5호서식)
If the development cost statement is not submitted within 40 days, a fine of KRW 1,000,000 applies, and if it is not submitted within three months from the end of the assessment period or is submitted falsely, the fine is KRW 2,000,000 (Article 29 of the Enforcement Decree). The 60-day land category change deadline and the 40-day statement deadline start together right after completion, so cost evidence should be organized when applying for the completion inspection.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.