Procedure
Procedure
- Permit Difficulty High
A procedure that allows a business, activity or stay that the law generally restricts, after review; licenses fall into this type. The authority reviews facility standards, location and consultation with other agencies, and a permit can be refused if the standards are not met.
- 01
Check the building use: Before signing a lease, check on the building register whether the building is used as a factory or as a Class 2 neighborhood living facility permitted by local ordinance, and rule out residential buildings from the start.
- 02
Design the workplace: Separate the raw material storage room, cutting room and packing room, create a flow that prevents cross-contamination from receiving to shipping, and plan cooling and lighting equipment to maintain at least 220 lux and 15℃ or below.
- 03
Reflect HACCP standards: HACCP became mandatory for businesses with sales of 2 billion won or more in 2023 and 500 million won or more in 2025, and will apply to those with 100 million won or more in 2027 and to all businesses from January 1, 2029, so designing the permit drawings to HACCP standards from the start reduces the need for later reconstruction.
- 04
Hygiene training and health examinations: The business operator completes livestock products hygiene training, and workers receive health examinations and prepare their certificates.
- 05
Permit application and on-site check: Submit the permit application with the workplace floor plan and facility layout to the city, county or district office; an official inspects the facilities, and the decision is notified within 8 days of receiving the application.
- 06
Product manufacturing report and change permit: File a product manufacturing report before starting production or within 7 days of starting, with supporting data for setting the use-by date. Relocating the workplace requires a change permit.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
Changing the drawings after the HACCP deadline has passed means rebuilding the workplace, so apply with a layout that meets HACCP standards from the permit stage.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.