Procedure
Procedure
- Permit Difficulty High
A procedure that allows a business, activity or stay that the law generally restricts, after review; licenses fall into this type. The authority reviews facility standards, location and consultation with other agencies, and a permit can be refused if the standards are not met.
- 01
Check the access route and the adjoining road: Confirm the land category and owners of the parcels the access road will cross using the land register and cadastral map, and determine which procedures are needed, among a private road opening permit, road occupation permit and connection permit, depending on whether the connecting road is a Road Act road, a rural road or an existing de facto road.
- 02
Secure the right to use land owned by others: Obtain a land use consent or contract that states the owner, the period of use, whether a fee is paid, and an agreement that the right of use carries over if ownership changes during the period. Without these items, the attachment requirements under Article 2 of the Enforcement Rule of the Private Road Act are not met.
- 03
Apply for the private road opening permit: Attach the plan drawing, construction plan, construction cost budget and plan, longitudinal and cross-section drawings to the private road opening permit application (Form No. 1 of the Enforcement Rule of the Private Road Act) and file it with the district or county office. Add a structural review for major structures such as bridges and a hydraulic review if the existing drainage system may be affected.
- 04
Apply for road occupation and connection permits: For the part using public road land, state the purpose, area, period and construction method on the road occupation permit application (Form No. 24 of the Enforcement Rule of the Road Act), attach electronic drawings, and file it with the road management authority. The processing period on the statutory form for metropolitan cities is 5 days for general occupation and 8 days for installing structures, and road excavation requires an opinion from the managers of major underground facilities.
- 05
Construction and use inspection: After construction, file a private road use inspection application (Form No. 3) with completion documents including drawings and photos showing the conditions before and after opening, and obtain a use inspection (processing period 7 days). The private road may not be used before the use inspection certificate is issued.
- 06
Management after opening: The road owner may not block public passage without a permit, and collecting a usage fee requires prior permission from the district office. If the status is transferred or inherited, the succession must be reported to the district office, and a road occupation permit must be extended before its period ends.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
사도(개설, 개축, 증축, 변경) 허가신청서(별지 제1호서식)
사도 사용검사 신청서(별지 제3호서식)
Opening a private road without a permit is punishable by a fine of up to KRW 7,000,000 (Article 16 of the Private Road Act), and occupying or connecting to a road without a permit is punishable by up to 2 years' imprisonment or a fine of up to KRW 20,000,000 (Article 114 of the Road Act), so construction should not start before the permits are obtained. Using a private road before the use inspection incurs an administrative fine of up to KRW 3,000,000 (Article 17 of the Private Road Act).
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.