Procedure
Procedure
- Notification Difficulty Low
You submit the statutory report form and required documents. Once the documents are in order the report is accepted; for some reports the authority checks the contents before accepting it.
- 01
Choose the business type and specialized fields: File as an engineering business for engineering activities in general, or as an engineering consulting business for research, planning, advice and guidance only. Select specialized fields (e.g., roads and airports, water supply and sewerage, air quality management) under the technical sectors of Annexed Table 1, and meet the reporting standards separately for each field.
- 02
Check technical personnel standards: An engineering business needs at least 3 technical-track engineering technicians including 1 special-grade technician; a consulting business needs at least 1 special-grade technician. A professional engineer counts as 1 special-grade and 1 entry-grade technician, and personnel must work exclusively on engineering activities, so employment at other companies and recognized fields and grades are checked.
- 03
Prepare the office and attachments: Obtain a certificate of engineering technicians held from the Korea Engineering and Consulting Association, and prove the office with a building register certificate or lease agreement. A corporation also prepares its corporate register certificate, and the trade name, representative and address on all documents are matched to the report.
- 04
Prepare and file the report with the Association: Attach the personnel deployment table by specialized field (Form No. 8-2) and other attachments to the engineering business report (Form No. 8) and submit them to the Korea Engineering and Consulting Association. To add a specialized field in the same technical sector, at least 3 technicians including 1 advanced-grade or higher technician in that field are required.
- 05
Respond to the notice and supplementation requests: Acceptance is notified within 30 days of receipt, and if supplementation is needed, a deadline of up to 3 months is set. If no notice is given within the period, the report is deemed accepted on the day after the period ends, and a report certificate is issued upon acceptance.
- 06
Succession on transfer and change reports: On acquisition, merger or inheritance, file the succession report (Form No. 12) within 30 days of the event, and check the previous business's sanction history with a confirmation of administrative disposition history before the acquisition. A change report is filed within 60 days when the trade name, representative, place of business, specialized field or technical personnel change.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
엔지니어링사업자 지위승계 신고서(별지 제12호서식)
엔지니어링사업자 신고서(별지 제8호서식)
전문분야별 기술인력 배치표(별지 제8호의2서식)
엔지니어링기술자 보유증명서(별지 제21호서식)
엔지니어링사업자 행정처분 이력 등 확인서(별지 제12호의3서식)
The effect of sanctions imposed on the previous business passes to the transferee for 1 year from the date of the disposition, and pending sanction procedures may continue, so check the sanction history with the confirmation of administrative disposition history before signing the transfer agreement.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.