Rural temporary-stay facility notifications and farmland-survey opinion documents

A rural stay shelter is a temporary building installed on farmland by a farmer, or a person who intends to engage in weekend or hands-on farming, for direct use as temporary lodging for farm work. It must have a total floor area of 33㎡ or less, the parcel must be at least 2 times the combined area of the shelter and any parking space, deck and similar facilities, and the farmland must adjoin a road usable by fire trucks; with these requirements met, you file a temporary building construction report with the mayor, county head or district head. After reporting, you must apply for a change to the farmland register within 60 days from the date of installation so the shelter is entered, and a consent for land use is required for farmland owned by another person. When the retention period ends, file an extension report, and on a parcel that already has a farm hut, the combined total floor area must not exceed 33㎡.

HWANG YUNSANG ADMINISTRATIVE OFFICESONGDO · 37.3892° N / 126.6439° E
#Rural temporary-stay facility notifications and farmland-survey opinion documents#Official check#39-2
🌐 Rural temporary-stay facility notifications and farmland-survey opinion documents
01

Procedure

Procedure

Procedure type
  • Notification Difficulty Low

    You submit the statutory report form and required documents. Once the documents are in order the report is accepted; for some reports the authority checks the contents before accepting it.

We will prepare the construction report for 1 shelter building and 1 lot of farmland and the documents for registration in the farmland ledger after installation. The investigation/pre-notification opinion form will be prepared in a separate format and distinguished from the actual shelter conversion report. Drawings and construction materials are provided, but design, construction, and on-site visits are separate.

Scope & fee
Temporary shelter construction notification and farmland ledger registration after installation
We provide 1 lot of farmland and 1 shelter building and support the preparation and submission of temporary building construction report and farmland register registration documents after installation with layout plan, floor plan, and use approval data. Surveying, design, construction, septic tank installation, and on-site visit are separate.
Official fee source ↗
Opinion statement for 1 investigation or advance notice; shelter-conversion notification excluded
We provide support for writing and submitting a 3-page opinion statement for approximately 20 pages of farmland, temporary buildings, and photographic materials for 1 investigation/prior notice. Actual shelter conversion report, construction, surveying, and on-site visit are separate.
Official fee source ↗
  1. 01

    1. Check whether the farmland is eligible — A shelter cannot be installed on farmland designated as a disaster prevention district, a collapse risk area or a natural disaster risk improvement district. The farmland must adjoin a road where fire trucks can operate, including township, village and farm roads and de facto passages long used by residents. Farmland in an agricultural promotion zone is also eligible if the requirements are met.

  2. 02

    2. Calculate the shelter and parcel area — The shelter's total floor area must be 33㎡ or less, and if eaves or similar parts project 1 m or more from the center line of the outer wall, the building area must also be 33㎡ or less. If a farm hut stands on the same parcel, the combined total floor area of the hut and shelter must be 33㎡ or less. The parcel must be at least twice the shelter's floor area plus any parking space and deck (including an outside septic tank), and parking spaces and decks must stay within the area set by Ministry of Agriculture, Food and Rural Affairs notice.

  3. 03

    3. File the temporary building report — Submit a temporary building construction report with a site plan and floor plan to the mayor, county head or district head, and start installation only after reporting. If the farmland belongs to someone else, attach a consent for land use. The installation and management standards in the local building ordinance also apply, so check the ordinance before reporting.

  4. 04

    4. Register in the farmland register within 60 days — Within 60 days of installing the shelter, apply to the head of the city, district, eup or myeon for a change of farmland use information so the shelter is entered in the farmland register. Entry in the register is one of the shelter requirements, and failure to apply is subject to a fine for negligence (1,000,000 won for the 1st violation).

  5. 05

    5. Residential fire safety equipment and extension of the retention period — The shelter must have residential fire safety equipment installed. The retention period is up to 3 years, and it may be extended by up to 3 years each time for the number of times set by the building ordinance, which may be set at 3 or more times for shelters. To extend, submit an extension report with photos of the front, back and both sides taken within 1 month, no later than 7 days before expiry.

02

Filing route

Filing route

Confirm the current filing office, jurisdiction, and online availability on the official website.

Confirm the current filing office, jurisdiction, and online availability on the official website.

Official check
Actual processing agencyCompetent Korean authority or official service
Statutory and policy authorityAgency by case
Online routeCompetent Korean authority or official service · Government24
03

Deadlines & processing notes

Deadlines & processing notes

Check deadlines and next steps against the notice, filing date, and any request for additional documents.Official check
04

Fees & official charges

Fees & official charges

Administrative service fee
  • Temporary shelter construction notification and farmland ledger registration after installation from KRW 500,000
  • Opinion statement for 1 investigation or advance notice; shelter-conversion notification excluded from KRW 400,000
All administrative service fees exclude 10% VAT.

Included in the basic fee — Initial document review, required-document guidance, basic form preparation, one filing support and responses to up to two supplement requests.

Conditional success fee — For this service, any conditional success fee may be separately agreed within the lawful service scope and stated in a written engagement agreement. No outcome is guaranteed.

Displayed amounts are starting estimates, not statutory or standard rates. The final fee is confirmed after consultation and document review in the engagement agreement. Government fees and actual expenses may change.

Fees & official charges →
05

Basic documents

Basic documents

Basic documents0 / 7

If you do not apply for a farmland register change within 60 days of installation, you are subject to a fine for negligence and the shelter does not meet its requirements. Include parking space, deck and outside septic tank areas when applying the 2x parcel area rule, and on a parcel with a farm hut keep the combined total floor area at 33㎡ or less.

Scope of services

Scope of services

Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.