Public procurement

Requirements for Participating in Regionally Restricted Competitive Bidding — The 180-Day Head Office Location Standard and Advance Preparation

When a local government announces a contract below a certain amount as a regionally restricted bid, only businesses whose head office on the corporate register (for an individual, the place of business stated in the business registration or a similar record) is in the metropolitan city or province (si/do) where the construction site or delivery location is situated may participate. A bidder must have its head office in that metropolitan city or province from 180 days before the bid notice date until the bid date, and the successful bidder until the contract date. Moving the head office just before the notice does not satisfy the requirement, so prepare in advance.

Procedure

Procedure type
  • Application Difficulty Medium

    An application for a subsidy, benefit, compensation or decision. The authority reviews whether the payment or selection criteria are met and then decides.

We prepare KONEPS supply/manufacturing registration, product listing, participation documents for each announcement, MAS application/price data, and state contract objection/mediation documents step by step. It does not include determining the bidding amount and transmitting an authorized signatory's electronic signature or the bid form.

Scope & fee
New registration for KONEPS supply and service bidding participation qualifications
We will review 15 pages of business/corporation/license data for 1 company registering a supply or service industry and prepare a registration application and attached documents. This is a case where prior industry registration has been completed, and manufacturing registration, product identification number, and individual bidding documents are separate. It does not include in-office submissions.
Official fee source ↗
New registration for KONEPS product manufacturing bidding participation qualifications
We will review 25 pages of factory, production, and permit data for 1 manufacturer and detailed product name and prepare a manufacturing registration application form and list of evidence. Direct production confirmation, new acquisition, on-site confirmation, and product identification number registration are separate. It does not include in-office submissions.
Official fee source ↗
KONEPS bidding participation qualification registration information changed
We will prepare 1 change registration for 1 company's name, representative, address, etc. Changed registration and business data are provided, and adding new industry and product names is a separate scope. It does not include in-office submissions.
Official fee source ↗
Request for registration and listing of procurement product identification number
We will provide you with 20 pages of Korean specifications, photos, and test data for 1 product model and 1 standard, and prepare an item attribute table and listing request materials. Testing, certification, new technical specifications, contracts, and shopping mall listings are separate. It does not include in-office submissions.
Official fee source ↗
Review individual public bidding participation requirements and prepare participation documents
We compare the conditions and 25 pages of qualifications and performance evidence for 1 company and 1 announcement and prepare a list of participation applications, pledges, and evidence. It does not include creating a new proposal, calculating price, determining bid amount, or using certificates. It does not include in-office submissions.
Official fee source ↗
Product MAS qualification evaluation/negotiation item application documents
We will prepare qualification evaluation and negotiation item application materials for up to 1 procurement company, 1 detailed product name, and 3 models. The scope is to provide 30 pages of completed specifications, tests, and performance data and valid proof of direct production, and pricing data, negotiations, and contracts are the next steps. It does not include in-office submissions.
Official fee source ↗
Preparation of product MAS price data and contract documents
We compare 30 cases and 40 pages of transaction data for 1 company and 3 models that have passed the qualification evaluation and prepare a price summary table, 3 pages of price proposal and contract confirmation memo, and attached materials. It does not include pricing decisions, negotiation statements, professional cost calculations, or representative electronic signatures. It does not include in-office submissions.
Official fee source ↗
Prepare an objection form for state contract bidding and contract procedures
We will review the statutory application requirements and 30 pages of public notice, evaluation, and notification materials for 1 act subject to a state contract, and prepare a 5-page reason for objection. Local contract mediation, committee retrial, and administrative appeals for restrictions on bidding participation are separate. It does not include in-office submissions.
Official fee source ↗
Preparing a request for reconsideration of state contract dispute mediation
We will review 40 pages of existing and additional data for 1 state contract dispute with the results of a prior objection and prepare a 5-page reason for retrial. It does not include new filing of prior objections, attendance at committees, statements, or lawsuits. It does not include in-office submissions.
Official fee source ↗
Preparation of opinions on restrictions on bid participation
We will review 25 pages of contract, performance, and correction data for 1 company and 1 prior notice, and prepare 5 pages of opinions and submission materials. administrative appeal and hearing attendance after disposition are separate. It does not include in-office submissions.
Official fee source ↗
  1. 1. Read the restrictions in the notice

    The procuring agency must state the restrictions and the standards for them in the bid notice. First check in the notice the scope of the regional restriction (whether it covers the relevant metropolitan city or province only, or extends to adjacent metropolitan cities or provinces), the required business type, and the performance record or construction capability standards.

  2. 2. Calculate the period of head office location

    The head office must be located in the relevant metropolitan city or province (si/do) continuously from 180 days before the bid notice date until the bid date. A new business that completed corporate registration or business registration during that period qualifies if it has been in that metropolitan city or province continuously from the date of corporate registration or the date of business registration. The successful bidder must keep its head office there until the contract date.

  3. 3. Match the business type registration and the Nara Jangteo (KONEPS) information

    Hold the business type registration required by the notice, such as landscape planting or landscape facility installation, and check that the business type and address in the Nara Jangteo bidding qualification registration information match the facts. If the head office has been moved, the corporate register, the business type registration and the Nara Jangteo information must all be corrected.

  4. 4. Prepare construction capability, performance record and credit rating documents

    For general construction works with an estimated price of 3,000,000,000 won or more, and for specialized construction works of 300,000,000 won or more, eligibility to participate may be restricted by construction capability or by a record of the same type of work, and the construction capability standard is set within 2 times the estimated price. Prepare the credit rating confirmation certificate and other documents used in the qualification examination so that they match the reference date set in the notice.

  5. 5. Secure bonus-point certifications before the notice

    In the qualification examination for local government facility construction, the reliability item evaluates only materials recognized as of the bid notice date, and those materials are submitted by the deadline for submitting qualification examination documents. The businesses eligible for special reliability bonus points are women-owned businesses, businesses owned by persons with disabilities and businesses located in population-decline areas, so obtain a women-owned business confirmation certificate or a confirmation certificate for a business owned by persons with disabilities before the notice.

Required documents

  • Bid participation application (Enforcement Rule of the Act on Contracts to Which a Local Government Is a Party, attached Form No. 3; a person registered for bidding qualification may substitute it by paying the bid bond)
  • Certificate of registered matters of the corporation, or business registration certificate
  • Business type registration certificate (the business type required by the notice)
  • Materials confirming Nara Jangteo bidding qualification registration
  • Construction capability evaluation confirmation certificate, certificates of performance record
  • Credit rating confirmation certificate
  • Certificates for bonus points (women-owned business, business owned by persons with disabilities, Family-Friendly Certification, etc., if applicable)

Fees

Administrative service fee
  • New registration for KONEPS supply and service bidding participation qualifications from KRW 300,000
  • New registration for KONEPS product manufacturing bidding participation qualifications from KRW 300,000
  • KONEPS bidding participation qualification registration information changed from KRW 200,000
  • Request for registration and listing of procurement product identification number from KRW 300,000
  • Review individual public bidding participation requirements and prepare participation documents from KRW 300,000
  • Product MAS qualification evaluation/negotiation item application documents from KRW 400,000
  • Preparation of product MAS price data and contract documents from KRW 600,000
  • Prepare an objection form for state contract bidding and contract procedures from KRW 500,000
  • Preparing a request for reconsideration of state contract dispute mediation from KRW 600,000
  • Preparation of opinions on restrictions on bid participation from KRW 500,000
All administrative service fees exclude 10% VAT.

Our office fee starts from the amount shown above and may vary depending on the type of certification and the scope of documents; we will give you an exact quote after reviewing your documents.

Legal basis and review date

  • Enforcement Decree of the Act on Contracts to Which a Local Government Is a Party, Article 20
  • Enforcement Rule of the Act on Contracts to Which a Local Government Is a Party, Article 25
  • Enforcement Rule of the Act on Contracts to Which a Local Government Is a Party, Article 24
  • Enforcement Rule of the Act on Contracts to Which a Local Government Is a Party, Article 38
  • Addenda to the Enforcement Rule of the Act on Contracts to Which a Local Government Is a Party (Ministry of the Interior and Safety Ordinance No. 620), Articles 1 and 3
  • Local Government Bidding and Contract Execution Standards (Ministry of the Interior and Safety Established Rule No. 372)
  • Standards for Determining Successful Bidders in Local Government Bidding (Ministry of the Interior and Safety Established Rule No. 373)

Checked against the statutes on

Statutes and public notices change, so each case needs to be checked individually. Statute titles are given in English for reference. The Korean statutes are the authoritative text.

Check these first

  • The date of registration of the head office relocation is the reference point for the 180-day calculation. If you plan a relocation, count back from the timing of the notice you intend to join and set the schedule.

Frequently asked questions

If we move the head office to Incheon just before the notice, can we join an Incheon regionally restricted bid?
No. The head office must be in the relevant metropolitan city or province (si/do) from 180 days before the bid notice date until the bid date, so a move just before the notice does not satisfy the requirement. However, a new business that was newly established or completed business registration within that period qualifies if it has been there continuously since then.
If we have a branch in Incheon, can we enter a regionally restricted bid?
The standard is the location of the head office on the corporate register. Even if a branch or factory is in the region, there is no eligibility to participate if the head office is in another metropolitan city or province (si/do).
Can a business from another metropolitan city or province (si/do) take part in a regionally restricted bid?
Only where the notice extends the regional scope to adjacent metropolitan cities or provinces. In that case too, the head office location period requirement applies in the same way, with the adjacent metropolitan cities or provinces included.
May we move the head office after winning the bid?
Not until the contract date. The successful bidder must have its head office in the relevant metropolitan city or province (si/do) until the contract date, so if you plan to relocate, postpone it until after the contract is concluded.
Does an administrative agent help with preparing for public bids?
Yes. Hwang Yunsang Administrative Office handles Nara Jangteo bidding qualification registration, checks the eligibility documents for each notice, and prepares and files application documents for bonus-point certifications such as women-owned business and Family-Friendly Certification on your behalf.

Contact us

Hwang Yunsang Administrative Office in Songdo, Incheon prepares and submits administrative documents and explains the procedure. If your situation is similar, send us a message.

📍 2697, 26F POSCO Tower-Songdo, 165 Convensia-daero, Yeonsu-gu, Incheon, Republic of Korea · 📞 010-3374-2687 · 🌐 hwangadmin.com

This guide is general information based on public sources. Requirements, documents and deadlines differ by case and by the competent agency, so please confirm them before you proceed.