We review options for correcting unauthorized buildings and prepare correction plans, completion reports, written opinions and application documents. The special act on specified buildings takes effect on 17 December 2026. Before that date, our service covers eligibility review and document preparation. Statutory filing is a separate procedure, subject to the actual filing requirements after the act takes effect.
Scope & fee
- Preliminary assessment
- We will review the status of 1 building, completion date, and technical data for possible maintenance and application of special laws, and issue the results of consultations with related organizations. It does not include filing of court applications, architectural design, or technical diagnosis. 1 office visit is included.
- Preparation of violation building correction implementation plan and deadline extension request form
- We will review 25 pages of status, process, and technical data for 1 building and 1 municipal notice and prepare a 3-page implementation plan and 1-page request for period adjustment. Acceptance of the request is determined by the management office and does not include design, safety diagnosis, or construction. It does not include in-office submissions.
- Official fee source ↗
- Report on completion of correction of violations and request for organization of building register markings
- We will review 20 pages of completed photos, technical confirmation, and drawing materials for 1 building building and prepare a 2-page completion report and 1 type of request for clearing violation marks. The government office confirms and decides whether corrections have been completed and the ledger is organized, and technical confirmation, construction, and field inspection are separate. It does not include in-office submissions.
- Official fee source ↗
- Preparation of opinions on corrective orders and enforcement fines in advance
- We will review 30 pages of violation facts, area, period, and imposition data for 1 building and 1 prior notice and prepare 5 pages of opinion and submission materials. administrative appeal after technical judgment, appraisal, field investigation, and disposition is separate. It does not include in-office submissions.
- Official fee source ↗
- 01
Checking the current status and stage of the measure: Review the illegal-building entry in the building ledger and the corrective order, enforcement fine warning or notice of imposition to confirm the area, use and structure of the violating part and whether the case is at the corrective order, warning or imposition stage.
- 02
Eligibility under the Special Act: Check whether the building was substantially completed on December 31, 2023, whether at least 50% of its floor area is residential, whether it falls within the 85 square meter (multi-household), 165 square meter (detached) or 660 square meter (multi-family) limits, and whether it lies in an excluded area such as an urban planning facility site, road buffer zone or conservation mountain area.
- 03
Gathering proof of the completion date: Prove completion and residential use before the end of 2023 with aerial photos, enforcement fine records, construction contracts, lease agreements and electricity and water usage records, and confirm land ownership or consent to use the land, or a management body resolution for collective buildings.
- 04
Specified building report and review: File the report with the city, county or district office (or its specified building support center, if one exists) within the reporting period set by the Enforcement Decree, attaching design documents and a site survey report prepared by an architect. If the building committee requires improvements to structural safety, evacuation, fire protection or parking, complete them before use approval is granted.
- 05
Comparing correction routes when the Act does not apply: Compare restoration with legalizing the building through an extension, major repair or change-of-use permit application or report under the Building Act. Once the correction is completed, new enforcement fines stop immediately, but fines already imposed are still collected.
- 06
Opinion statement and administrative appeal: On receiving a prior notice or warning, submit an opinion statement with a correction plan and grounds for reduction by the deadline stated in the notice. If there are grounds to contest the imposition, file an administrative appeal petition with the provincial administrative appeals commission within 90 days of learning of the measure.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Fees & official charges
Fees & official charges
Included in the basic fee — Initial document review, required-document guidance, basic form preparation, one filing support and responses to up to two supplement requests.
Conditional success fee — For this service, any conditional success fee may be separately agreed within the lawful service scope and stated in a written engagement agreement. No outcome is guaranteed.
Displayed amounts are starting estimates, not statutory or standard rates. The final fee is confirmed after consultation and document review in the engagement agreement. Government fees and actual expenses may change.
Fees & official charges →Basic documents
Basic documents
건축ㆍ대수선ㆍ용도변경(변경)허가 신청서(별지 제1호의4서식)
건축ㆍ대수선ㆍ용도변경(변경)신고서(별지 제6호서식)
A covered building that has never been charged an enforcement fine is subject to an administrative fine equal to 5 times the enforcement fine calculated under Article 80 of the Building Act, and if it was charged fewer than 5 times, the amount already paid is deducted. Incheon Metropolitan City charges half the enforcement fine once a year for residential buildings with a total floor area of 60 square meters or less, among others, but the reduction under Article 80-2 of the Building Act does not apply if the violation is not corrected within 2 years of the first corrective order.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.